Sign In | Join Free | My disqueenfrance.com
China Shanghai Bozhong Metal Group Co., Ltd. logo
Shanghai Bozhong Metal Group Co., Ltd.
To sell metal from the world while the world buy metal from Bozhong
Active Member

6 Years

Home > Alloy Steel Pipe >

Building Construction Use Alloy Steel Pipe , Metal High Pressure Boiler Tube

Shanghai Bozhong Metal Group Co., Ltd.
Contact Now

Building Construction Use Alloy Steel Pipe , Metal High Pressure Boiler Tube

Brand Name : Bozhong

Model Number : ASTM A335 P92

Certification : ISO / TUV / DNV

Place of Origin : China

MOQ : negotiable

Price : negotiable

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 1000TON/MONTH

Delivery Time : 3--10days

Packaging Details : seaworthy packing or as required

Description : Stainless Steel Sheet

Grade : ASTM A335 P92

Standard : AISI, ASTM, DIN, EN, GB ,JIS

Dimension : Accept custom

MOQ : Different

Contact Now

Steel grade: ASTM A335 P92

Packing:

Bare packing/bundle packing/crate packing/wooden protection at the both sides of tubes and suitably protected for sea-worthly delivery or as requested.

Inspection and Test:

Chemical Composition Inspection, Mechanical Properties Test(Tensile Strength,Yield Strength, Elongation, Flaring, Flattening, Bending, Hardness, Impact Test), Surface and Dimension Test,No-destructive Test, Hydrostatic Test.

Surface treatment:

Oil-dip, Varnish, Passivation, Phosphating, Shot Blasting.
Both ends of each crate will indicate the order no., heat no., dimensions, weight and bundles or as requested.

Chemical Requirements of ASTM A335 P92
UNS Designation K92460
Carbon 0.07–0.13
Manganese 0.30–0.60
Phosphorus(max) 0.02
Sulfur(max) 0.01
Silicon 0.50 max
Chromium 8.50–9.50
Molybdenum 0.30–0.60
V 0.15-0.25
N 0.03-0.07
Ni (max) 0.4
Al(max) 0.02
Cb 0.04-0.09
W 1.5-2.00
B 0.001-0.006
Ti (max) 0.01
Zr(max) 0.01
Mechanical Properties of ASTM A335 P92
Properties Data
Tensile strength, min, (MPa) 620
Yield strength, min, (MPa) 440
Elongation, min, (%), L/T 20/…
Material & Manufacture

Pipe may be either hot finished or cold drawn with the finishing heat treatment noted below.

Heat Treatment
  • A / N+T
  • N+T / Q+T
  • N+T
Mechanical Tests Specified
  • Transverse or Longitudinal Tension Test and Flattening Test, Hardness Test, or Bend Test
  • For material heat treated in a batch-type furnace, tests shall be made on 5% of the pipe from each treated lot. For small lots, at least one pipe shall be tested.
  • For material heat treated by the continuous process, tests shall be made on a sufficient number of pipe to constitute 5% of the lot, but in no case less than 2 pipe.

Product Tags:

alloy steel tube

      

hollow steel tube

      
China Building Construction Use Alloy Steel Pipe , Metal High Pressure Boiler Tube wholesale

Building Construction Use Alloy Steel Pipe , Metal High Pressure Boiler Tube Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Bozhong Metal Group Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0